Case Study

Marriott Minneapolis Airport

Quarterly preventative maintenance on a BOGE C7.5L rotary screw compressor, Keltec KRAD-40 refrigerated dryer, and C-Aire tank for a hotel's industrial laundry operation. Included diagnosing and correcting an electrical wiring issue caused by a previous contractor.

Industry
Industrial Laundry Operation for Hotel
Service Type
Quarterly Preventative Maintenance
Equipment
BOGE C7.5L Rotary Screw Air Compressor
Keltec KRAD-40 Refrigerated Dryer
C-Aire Tank
BOGE C7.5L Rotary Screw Air Compressor installed at Marriott Minneapolis Airport

The Challenge

The hotel's industrial laundry facility relied on a BOGE C7.5L rotary screw compressor with a Keltec KRAD-40 dryer and C-Aire tank for pressing equipment and general maintenance. Electricians had previously rewired the motor from 230V to 460V but failed to rewire the transformer, causing fuses to trip repeatedly. The system also required quiet operation due to proximity to guest areas.

The Solution

Diagnosed and corrected the transformer wiring issue left by the previous electricians — rewired the transformer to match the 460V motor conversion and replaced the blown fuses. Performed full quarterly maintenance: blew out the cooler and unit, replaced the thermal valve and sensor, changed oil, replaced oil filter, air filter, and Tsunami separator filter. Changed the scavenge line screen and verified flow through the stone. Serviced the solenoid, cleaned and re-lubed the inlet and minimum pressure valve, and wiped down the unit.

Services Performed

  • Diagnosed and rewired transformer (electricians had rewired motor from 230V to 460V but did not rewire transformer, causing fuses to trip)
  • Replaced fuses
  • Blew out cooler and unit
  • Replaced thermal valve and sensor
  • Oil change
  • Replaced oil filter
  • Replaced air filter
  • Replaced Tsunami separator filter
  • Changed scavenge line screen and verified flow through stone
  • Serviced solenoid
  • Cleaned and re-lubed inlet and MP valve
  • Wiped down unit

The Result

Electrical issue fully resolved — no more tripped fuses. Reliable, quiet compressed air restored for 24/7 hotel laundry and maintenance operations with noise levels well within guest comfort standards.

Need similar work?

Tell us about your system and we'll plan the right service.

Get a Quote