
Heppner's Auto Body Hudson
BOGE C20 Rotary Screw
New compressor installs, piping systems, and full air-distribution upgrades. We handle site planning, electrical coordination, and startup commissioning end-to-end.
A new compressor isn't an off-the-shelf swap. Sizing, location, electrical, drainage, ventilation, and piping all influence whether the system runs efficiently for the next 15 years or limps along. We plan the install before the truck rolls — then commission, document, and train your team on day one.
We size the compressor to your actual demand profile — peak CFM, duty cycle, future expansion. No oversold equipment.
Compressor room layout, ventilation, drainage, and piping route mapped before installation begins.
We work with your electrician on disconnect sizing, voltage, and conduit. Verified before startup.
Prevost aluminum push-to-connect piping for clean, leak-free distribution sized to peak demand.
First-run inspection, oil prime, valve adjustment, pressure switch calibration, and load-test under operating conditions.
Walkthrough with your maintenance staff — daily checks, drain testing, what to watch for, when to call us.
We come on-site to map space, demand, electrical, and piping route.
Equipment, install labor, piping, and commissioning — all in one number.
Install scheduled around your operation, often a single shutdown window.
Compressor set, piped, electrified, and commissioned. Operator walkthrough on completion.
Wiring diagram, pressure settings, service log, and warranty registration handed off.
A correctly sized and installed compressor will outlast its warranty by a decade. An undersized unit, badly piped distribution, or skipped commissioning steps cost double — once on the install, again on the early replacement.
Tell us about your compressed air needs and a technician will respond within one business day. For emergencies, call us directly.